[X]
Report Link
Video has been deleted
Wrong video
Audio out of sync
There was an error converting the video
Other (explain below)

Details:

Lauren Kushner and Mike Musser just bought their dream home. It has tons of character, but is in need of some serious repairs, most importantly in the master bathroom. In it's current state, the bathroom is nonfunctional, run-down, dirty and simply not up to their standards of what a master bath should be. A full bathroom teardown will kickoff this renovation. Everything must go, tiled floor, ugly shower, unusable jacuzzi tub, outdated vanity. After demoing this bathroom down to its bare bones, new tile flooring, subway tiled shower with multiple jets and heads, a refinished claw foot tub and a new vanity will be installed. While neither is a stranger to smaller renovations, Lauren's confrontational and controlling attitude has been known to cause a few sparks between the couple. This complete bathroom overhaul will surely be a strenuous project, but as long as Mike's prepared to accommodate all of Lauren's demands, they should end up with their ideal bathroom.

Running
  • Currently 0.0/5
(0 votes)
Title: The Kushner Job
Air Date: October 18, 2014
Runtime: 30 min
Genres: DIY

Free Links

Currently there are no links. Request links

Search on other sites

Renovation Realities ( S13 E3 ) Comments

Post a Comment

Please login to make a comment

Comments