[X]
Report Link
Video has been deleted
Wrong video
Audio out of sync
There was an error converting the video
Other (explain below)

Details:

Building a grand design takes time and more often than not, takes longer than anyone expects. Phil and Ariana have given themselves just two weeks to build their home in Maianbar, in Sydney's south, regardless of the fact they've never built anything before. Utilising a build system that has never been used for domestic housing in Australia before, this could either be a new blueprint for construction in this country, or a complete disaster. They've chosen a building method popular in European residential construction - cross-laminated timber which is essentially a flat pack home using wood compressed to be as strong as steel. With the design focused entirely on making the water views the centrepiece of the build, the house is put together piece by piece like a giant Meccano set. But with 130-plus timber panels precision-cut in an Austrian factory and installed in a strict order on site, there is no room for error. With Phil drawing on his skills in HR to project manage, will his unrelenting obsession with a strict time frame compromise the integrity of the design?

Running
  • Currently 0.0/5
(0 votes)
Title: Maianbar Cross Laminated Timber, NSW
Air Date: May 4, 2017
Runtime: Unknown

Free Links

Currently there are no links. Request links

Search on other sites

Grand Designs Australia ( S7 E2 ) Comments

Post a Comment

Please login to make a comment

Comments